Header Ads

google.com, pub-7237988725091974, DIRECT, f08c47fec0942fa0

Philippine Navy and Marine Corps Projects

Re-Horizon 3 Projects (2023 - 2032)

Frigate Full Complement Project

8. Frigate (Full Complement)

Project Status: Procurement Phase / Pre-Tender
Contractor & Product: HD Hyundai Heavy Industries - Improved HDF-3200 Frigate
Fast Interdiction Craft with Missiles Phase 2 Project

10. Fast Attack Interdiction Craft with Missiles (Phase 2)

Project Status: Procurement Phase / Pre-Tender
Contractor & Product: TBC. Offers include Israel Shipyards Shaldag Mk. V and OCEA FPB-98 Mk.2

Horizon 2 Projects (2018 - 2022)

1.1 Corvette Lot 1 – Platform

1.1 Corvette Lot 1 – Platform

Project Status: Completed
Contractor & Product: HD Hyundai Heavy Industries – HDC-3200 / Miguel Malvar-class frigate
1.2 Corvette Lot 2 – Weapons and Munitions

1.2 Corvette Lot 2 – Weapons and Munitions

Project Status: Delivery ongoing
Contractor & Product: LIG Nex1 K745 Blue Shark torpedoes / MBDA VL MICA ship-to-air missile system / Aselsan ATOM 35mm air burst and 35mm HEI munition
2. Offshore Patrol Vessels

2. Offshore Patrol Vessels

Project Status: Delivery Ongoing
Contractor & Product: HD Hyundai Heavy Industries – HDP-2200+ / Rajah Sulayman-class offshore patrol vessel
3. Landing Docks

3. Landing Docks

Project Status: Delivery Ongoing
Contractor & Product: PT PAL Indonesia – 123m Improved Strategic Sealift Vessel
4. Del Pilar-class Frigate Upgrade

4. Del Pilar-class Frigate Upgrade

Project Status: Completed
Contractor & Product: Hanwha Systems - Hanwha Systems Naval Shield BL2.xx Combat Management System, ELAC Hunter 2.0 Hull-Mounted Sonar, Elbit Elisra NS9300A Radar Electronic Support Measures, and Installation and Integration of PN-supplied equipment including Saab Sea Giraffe AMB 3D air/surface search radar and FLIR SeaFLIR 230 EOTS camera
5. Pohang-class Corvette Transfer

5. Pohang-class Corvette Transfer

Project Status: Completed
Contractor & Product: ROK Ministry of Defnese – ex-ROKS Chungju (PCC-762) / BRP Conrado Yap, plus Multiple Contractors
6. Jacinto-class Patrol Vessel Upgrade

6. Jacinto-class Patrol Vessel Upgrade

Project Status: Completed
Contractor & Product: Herma Shipyard – Repowering of BRP Artemio Ricarte (PS-37)
7.1 MPAC Upgrade Lot 1 – Weapon Systems

7.1 MPAC Upgrade Lot 1 – Weapon Systems

Project Status: Completed
Contractor & Product: Rafael Advanced Defense Systems – Mini Typhoon 7.62mm RCWS, Typhoon MLS-ER missile launcher, Spike-ER surface-to-surface missile
7.2 MPAC Upgrade Lot 2 – Mission Essential Equipment

7.2 MPAC Upgrade Lot 2 – Mission Essential Equipment

Project Status: Completed
Contractor & Product: Propmech Corporation
8. Tactical Combat Vehicle

8. Tactical Combat Vehicle

Project Status: Cancelled, to be procured outside Horizon 2
Contractor & Product: Not applicable
9. Light Armor System Upgrade

9. Light Armor System Upgrade

Project Status: Completed
Contractor & Product: Larsen & Toubro – V-150 and V-300 Engine and Turret Upgrade Works
10. Naval Helicopter Weapons Upgrade

10. Naval Helicopter Weapons Upgrade

Project Status: Cancelled
Contractor & Product: Not Applicable
11. Multi-Purpose Amphibian Aircraft

11. Multi-Purpose Amphibian Aircraft

Project Status: Moved to Re-Horizon 3 / Special Projects
Contractor & Product: To be announced
12. Squad Rocket Launcher Light

12. Squad Rocket Launcher Light

Project Status: Completed
Contractor & Product: Arsenal JSCo. – ATGL-L RPG Launchers & Ammunition
13. Company Multi-Purpose Bunker Defeat Weapon

13. Company Multi-Purpose Bunker Defeat Weapon

Project Status: Cancelled, to be procured outside Horizon 2
Contractor & Product: Not Applicable
14.1 Force Protection Equipment Lot 1 – Body Armor

14.1 Force Protection Equipment Lot 1 – Body Armor

Project Status: Completed
Contractor & Product: Marom Dolphin – Fusion System Body Armor & Accessories
14.2 Force Protection Equipment Lot 2 – Helmets

14.2 Force Protection Equipment Lot 2 – Helmets

Project Status: Completed
Contractor & Product: Marom Dolphin – Fusion System High Cut Ballistic Helmets & Accessories
15.1 Mortar Lot 1 – 60mm Mortar

15.1 Mortar Lot 1 – 60mm Mortar

Project Status: Awaiting Contract Signing
Contractor & Product: Rheinmetall EXPAL Systems – RSG60 Lightweight 60mm Combi Mortar
15.2 Mortar Lot 2 – 81mm Mortars

15.2 Mortar Lot 2 – 81mm Mortars

Project Status: Completed
Contractor & Product: Rheinmetall EXPAL Systems – MX2 KM 81mm Mortars

Horizon 1 Projects (2013 - 2017)

Jose Rizal-class Frigate

2.1. Frigate Lot 1 - Platform

Project Status: Completed
Contractor & Product: HD Hyundai Heavy Industries - HDF-2600 frigates (Jose Rizal-class)

Annual Capital Outlay (ACO) Projects

Base Upgrade

Naval Base Infrastructure Upgrades

Tracking yearly maintenance, localized pier reinforcements, and facilities construction funded via routine annual capital allocations rather than larger modernization program blocks.

No comments

Featured Post

Long Range Patrol Aircraft Acquisition Project of the Philippine Air Force

The Philippine Air Force has embarked on the acquisition of Maritime Patrol Aircraft under the Long Range Patrol Aircraft (LRPA) Acquisition...

Philippine Navy Projects

Philippine Army Projects

Philippine Air Force Projects

Philippine Coast Guard Projects

PNP Maritime Group Projects

Powered by Blogger.